We have an exciting turnkey testing system currently in production which will be used for the research and development of a transformative well plugging and abandonment technology.
Having been commissioned by Clearwell Technology, a new disruptive oilfield technology provider, our engineers have worked closely together in designing this complex high pressure simulation system in order to prove the next generation decommissioning technology will operate safely, and as expected, in typical wellbore conditions.
The system includes a 400 bar (5,800 psi) hyperbaric test chamber with multiple ports and penetrations, operating between 0°C to 200°C. A gas booster module includes separate gas circuits for charging, maintaining, storing and controlling test times and gas flows.
Here we have KW’s notified body Zurich Engineering – UK engineers carrying out the necessary inspections that provide essential documentation for us and our customer. Paul Ray and Bruce Cardno.
For assistance with all our types of cost-effective automated high pressure testing systems please contact Adam Hill on +44 (0) 1257 474507 or email adam.hill@kwdesign.co.uk
For assistance and availability within our purpose-built, in-house environmental and high pressure testing facility, please contact Henry Currie on +44 (0) 1257 474507 or email henry.currie@kwpressuretesting.co.uk